Your search:
From a functional point of view and taking into account the different user profiles the Skatepark is divided into two areas: Training Bowl and Skate Initiation Course…
Two new sports facilities has been designed on the west side of the skatepark. One of them is a parkour facility. Next to the parkour facility, a skateboarding spot has been designed, taking as a reference the urban architecture and materials of the best-known spots in Madrid…
The project identifies different areas of the skatepark according to concept design and difficulty level. The design includes flow park, street park and a learning area easily recognized by the shapes and colors of the concrete. The skatepark as a whole occupies 800 m2.
This project is about restoring this space to its original use. For this purpose, 8 granite and metal spots are designed functionally arranged to configure a street course. Before the spots were built, the pavement was polishied to eliminate the roughness caused by erosion. ..
The skateboarding character of this place has been reinforced and consolidated with the construction of new concrete obstacles to replace the sheet metal ramps and DIY obstacles. Additionally, a volleyball court and a pumptrack have been designed to respond to other demands from different groups…
Skatepark design is adapted to the irregular shape of the available plot to include a mixed street and ramp course. Volumes and shapes are combined with concrete colors and metal, concrete and granite coopings.
The program is divided into three actions that order the plot: a Skatepark, a Pumptrack and a Parking. The parking is located from the road access, giving rise to a common pedestrian access to both sports facilities. The Skatepark is located on the left side of the plot and runs longitudinally, while the Pumptrack is located on the remaining right side…